DocumentCode :
377679
Title :
Status of the Fermilab Main Injector
Author :
Koba, K.
Author_Institution :
Fermi Nat. Accel. Lab., Batavia, IL, USA
Volume :
1
fYear :
2001
fDate :
2001
Firstpage :
27
Abstract :
The Fermilab Main Injector is a rapid cycling proton synchrotron. It is designed to accelerate protons and antiprotons to 150 GeV. The initial commissioning phase was in the summer of 1999. Since then, Main Injector has been supporting the high energy physics program at Fermilab. Beam studies for continued improvements in machine performance are in progress, in order to support a luminosity of 8*1031 cm-2 sec-1 during Run IIa. The status of the Main Injector and beam studies results are presented
Keywords :
particle beam injection; proton accelerators; synchrotrons; 0 to 150 GeV; Fermilab Main Injector status; antiprotons; initial commissioning phase; machine performance; rapid cycling proton synchrotron; Acceleration; Linear particle accelerator; Particle beam injection; Particle beams; Particle production; Protons; Radio frequency; Shape; Synchrotrons; Voltage;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 2001. PAC 2001. Proceedings of the 2001
Conference_Location :
Chicago, IL
Print_ISBN :
0-7803-7191-7
Type :
conf
DOI :
10.1109/PAC.2001.987422
Filename :
987422
Link To Document :
بازگشت