• DocumentCode
    377679
  • Title

    Status of the Fermilab Main Injector

  • Author

    Koba, K.

  • Author_Institution
    Fermi Nat. Accel. Lab., Batavia, IL, USA
  • Volume
    1
  • fYear
    2001
  • fDate
    2001
  • Firstpage
    27
  • Abstract
    The Fermilab Main Injector is a rapid cycling proton synchrotron. It is designed to accelerate protons and antiprotons to 150 GeV. The initial commissioning phase was in the summer of 1999. Since then, Main Injector has been supporting the high energy physics program at Fermilab. Beam studies for continued improvements in machine performance are in progress, in order to support a luminosity of 8*1031 cm-2 sec-1 during Run IIa. The status of the Main Injector and beam studies results are presented
  • Keywords
    particle beam injection; proton accelerators; synchrotrons; 0 to 150 GeV; Fermilab Main Injector status; antiprotons; initial commissioning phase; machine performance; rapid cycling proton synchrotron; Acceleration; Linear particle accelerator; Particle beam injection; Particle beams; Particle production; Protons; Radio frequency; Shape; Synchrotrons; Voltage;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 2001. PAC 2001. Proceedings of the 2001
  • Conference_Location
    Chicago, IL
  • Print_ISBN
    0-7803-7191-7
  • Type

    conf

  • DOI
    10.1109/PAC.2001.987422
  • Filename
    987422