• DocumentCode
    377931
  • Title

    Spear2 RF operation: a bridge to Spear3

  • Author

    Park, Sanghyun

  • Author_Institution
    Linear Accel. Center, Stanford Univ., CA, USA
  • Volume
    4
  • fYear
    2001
  • fDate
    2001
  • Firstpage
    2662
  • Abstract
    The present schedule calls for Spear2 RF system operation until March of 2003, when it will be dismantled to make room for the Spear3. While any new investment to improve the system is discouraged for this limited-time operation, efforts are focused on maintaining the system reliability and accommodating any changes necessitated by new construction in preparation for the Spear3. In this paper we will present our operational experience with the changes incorporated into the system. The Booster RF system improvement to raise the injection energy from 2.3 to 3.0 GeV will be also discussed
  • Keywords
    accelerator RF systems; electron accelerators; particle beam injection; storage rings; 2.3 to 3 GeV; Booster RF system; RF system; Spear2; Spear3; injection energy; Bridges; Cathodes; Investments; Klystrons; Linear accelerators; Linear particle accelerator; Maintenance; Radio frequency; Tuners; Turning;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 2001. PAC 2001. Proceedings of the 2001
  • Conference_Location
    Chicago, IL
  • Print_ISBN
    0-7803-7191-7
  • Type

    conf

  • DOI
    10.1109/PAC.2001.987865
  • Filename
    987865