DocumentCode
377931
Title
Spear2 RF operation: a bridge to Spear3
Author
Park, Sanghyun
Author_Institution
Linear Accel. Center, Stanford Univ., CA, USA
Volume
4
fYear
2001
fDate
2001
Firstpage
2662
Abstract
The present schedule calls for Spear2 RF system operation until March of 2003, when it will be dismantled to make room for the Spear3. While any new investment to improve the system is discouraged for this limited-time operation, efforts are focused on maintaining the system reliability and accommodating any changes necessitated by new construction in preparation for the Spear3. In this paper we will present our operational experience with the changes incorporated into the system. The Booster RF system improvement to raise the injection energy from 2.3 to 3.0 GeV will be also discussed
Keywords
accelerator RF systems; electron accelerators; particle beam injection; storage rings; 2.3 to 3 GeV; Booster RF system; RF system; Spear2; Spear3; injection energy; Bridges; Cathodes; Investments; Klystrons; Linear accelerators; Linear particle accelerator; Maintenance; Radio frequency; Tuners; Turning;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2001. PAC 2001. Proceedings of the 2001
Conference_Location
Chicago, IL
Print_ISBN
0-7803-7191-7
Type
conf
DOI
10.1109/PAC.2001.987865
Filename
987865
Link To Document