DocumentCode :
377931
Title :
Spear2 RF operation: a bridge to Spear3
Author :
Park, Sanghyun
Author_Institution :
Linear Accel. Center, Stanford Univ., CA, USA
Volume :
4
fYear :
2001
fDate :
2001
Firstpage :
2662
Abstract :
The present schedule calls for Spear2 RF system operation until March of 2003, when it will be dismantled to make room for the Spear3. While any new investment to improve the system is discouraged for this limited-time operation, efforts are focused on maintaining the system reliability and accommodating any changes necessitated by new construction in preparation for the Spear3. In this paper we will present our operational experience with the changes incorporated into the system. The Booster RF system improvement to raise the injection energy from 2.3 to 3.0 GeV will be also discussed
Keywords :
accelerator RF systems; electron accelerators; particle beam injection; storage rings; 2.3 to 3 GeV; Booster RF system; RF system; Spear2; Spear3; injection energy; Bridges; Cathodes; Investments; Klystrons; Linear accelerators; Linear particle accelerator; Maintenance; Radio frequency; Tuners; Turning;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 2001. PAC 2001. Proceedings of the 2001
Conference_Location :
Chicago, IL
Print_ISBN :
0-7803-7191-7
Type :
conf
DOI :
10.1109/PAC.2001.987865
Filename :
987865
Link To Document :
بازگشت