DocumentCode :
377935
Title :
SPEAR 3 upgrade project: a status report
Author :
Corbett, W. ; Hettel, R. ; Akre, R. ; Bellomo, P. ; Boyce, R. ; Cadapan, L. ; Cassel, R. ; Choi, B. ; Orco, D. Dell ; Evans, I. ; Elioff, T. ; Fuller, R. ; Kurita, N. ; Langton, J. ; Leyh, G. ; Limborg, C. ; Macnair, D. ; Martin, D. ; Medvedko, E. ; Ng, C
Author_Institution :
Linear Accel. Center, Stanford Univ., CA, USA
Volume :
4
fYear :
2001
fDate :
2001
Firstpage :
2674
Abstract :
The SPEAR 3 upgrade project at SSRL will replace the original FODO lattice with a 234-m, 18-cell DBA lattice with gradient dipoles. The new hardware draws heavily on PEP-II B-Factory technology: a copper vacuum chamber, IGBT power supply technology, and mode-damped rf cavities to reach beam currents up to 500 mA at 3 GeV. First article magnets, supports, girders, vacuum chambers, pumps and RF components have been fabricated and a prototype girder assembly is nearing completion. I&C systems, radiation shielding and utility upgrades are in progress. In this paper we report on the status of the main accelerator subsystems
Keywords :
accelerator RF systems; accelerator cavities; accelerator magnets; electron accelerators; storage rings; vacuum apparatus; 3 GeV; Cu vacuum chamber; DBA lattice; IGBT power supply; SPEAR 3 upgrade project; gradient dipoles; mode-damped rf cavities; pumps; vacuum chambers; Copper; Hardware; Insulated gate bipolar transistors; Lattices; Magnets; Power supplies; Prototypes; Radio frequency; Structural beams; Vacuum technology;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 2001. PAC 2001. Proceedings of the 2001
Conference_Location :
Chicago, IL
Print_ISBN :
0-7803-7191-7
Type :
conf
DOI :
10.1109/PAC.2001.987869
Filename :
987869
Link To Document :
بازگشت