Title :
Induction synchrotron. III. Rapid cycle synchrotron and slow cycle synchrotron. (Hardware components for the upgrade of KEK 12 GeV PS)
Author :
Takayama, K. ; Arakida, Y. ; Egawa, K. ; Igarashi, S. ; Kishiro, J. ; Nakamura, E. ; Sakuda, M. ; Shirakata, M. ; Toyama, T. ; Uota, M.
Author_Institution :
KEK, Tsukuba, Japan
Abstract :
A technique of super-bunch acceleration with high repetition induction accelerators and an accumulator ring (AR) are required for the upgrade of the 12 GeV proton synchrotron at KEK. A fast dynamic switching of 3 kV flip-flop pulses was performed at 200 kHz with SI-thyristors, to confirm a barrier bucket scheme for induction acceleration. On the other hand, a model permanent gradient magnet for the AR was assembled to investigate its field quality, temperature dependence and compensation
Keywords :
accelerator magnets; magnetic field measurement; permanent magnets; proton accelerators; synchrotrons; thyristors; 3 kV; accumulator ring; barrier bucket; induction synchrotron; permanent gradient magnet; permanent magnet; proton synchrotron; rapid cycle synchrotron; slow cycle synchrotron; static induction thyristor; super-bunch acceleration; Acceleration; FETs; Flip-flops; Hardware; Magnetic materials; Particle beams; Proposals; Switches; Synchrotrons; Thyristors;
Conference_Titel :
Particle Accelerator Conference, 2001. PAC 2001. Proceedings of the 2001
Conference_Location :
Chicago, IL
Print_ISBN :
0-7803-7191-7
DOI :
10.1109/PAC.2001.988086