DocumentCode
378124
Title
The preparation of the cryomagnets and the assembly of the LHC test String 2
Author
Andujar, O. ; Bozzini, D. ; Calzas-Rodriguez, C. ; Cruikshank, P. ; Desebe, O. ; Dobers, T. ; Jacquemod, A. ; Kos, N. ; Lepeule, P. ; Maan, W. ; Missiaen, D. ; Parma, V. ; Riddone, G. ; Rodriguez-Mateos, F. ; Rohmig, P. ; Saban, R. ; Schneider, G. ; Serio
Author_Institution
CERN, Geneva, Switzerland
Volume
5
fYear
2001
fDate
2001
Firstpage
3433
Abstract
The numerous complex activities required to prepare the cryomagnets for the installation in String 2 are described. These include the configuration of the mechanical interfaces, the conditioning of the beam tubes, the installation of beam screens and the instrumentation as well as the final checks. The preparation of the cryomagnets for String 2 has been a dress rehearsal for the preparation that the cryomagnets will undergo before their installation in the tunnel. After a description of the interconnection procedures of the components for String 2, the tests carried-out to release the String for operation are described. A brief account of the lessons learnt is also given
Keywords
accelerator RF systems; accelerator magnets; cryogenics; electromagnets; ion accelerators; ion beams; particle beam diagnostics; storage rings; synchrotrons; LHC; LHC test string 2; MRB; beam screens; beam tube conditioning; cryomagnets; dipole magnets; final checks; instrumentation; interconnection procedures; magnet return box; mechanical interfaces; radiofrequency contacts; Assembly; Cables; Circuit testing; Cryogenics; Floors; Instruments; Integrated circuit interconnections; Large Hadron Collider; Magnets; Prototypes;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2001. PAC 2001. Proceedings of the 2001
Conference_Location
Chicago, IL
Print_ISBN
0-7803-7191-7
Type
conf
DOI
10.1109/PAC.2001.988135
Filename
988135
Link To Document