• DocumentCode
    378140
  • Title

    RHIC Beam Abort Kicker Power Supply System commissioning experience and remaining issues

  • Author

    Zhang, W. ; Ahrens, L.A. ; Mi, J. ; Oerter, B. ; Sanders, R. ; Sandberg, J.

  • Author_Institution
    Collider-Accelerator Dept., Brookhaven Nat. Lab., Upton, NY, USA
  • Volume
    5
  • fYear
    2001
  • fDate
    2001
  • Firstpage
    3711
  • Abstract
    The RHIC Beam Abort Kicker Power Supply Systems commissioning experience and the remaining issues will be reported in this paper. The RHIC Blue Ring Beam Abort Kicker Power Supply System initial commissioning took place in June 1999. Its identical system in the Yellow Ring was brought on line during Spring 2000. Each of the RHIC Beam Abort Kicker Power Supply Systems consists of five high voltage modulators and subsystems. These systems are critical devices for RHIC machine protection and environmental protection. They are required to be effective, reliable and operating with sufficient redundancy to safely abort the beam to its beam dump at the end of accumulation or at any time when they are commanded. To deflect 66 GeV ion beam to the beam absorbers, the RHIC Beam Abort Kicker Power Supply Systems were operated at 22 kV level. The RHIC 2000 commissioning run was very successful
  • Keywords
    accelerator magnets; ion accelerators; power supplies to apparatus; storage rings; 22 kV; Beam Abort Kicker Power Supply System; Blue Ring; RHIC; RHIC 2000; Yellow Ring; voltage modulators; Acceleration; Colliding beam devices; Energy storage; Magnetic modulators; Optical modulation; Particle beams; Power supplies; Power system protection; Pulse modulation; Voltage;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 2001. PAC 2001. Proceedings of the 2001
  • Conference_Location
    Chicago, IL
  • Print_ISBN
    0-7803-7191-7
  • Type

    conf

  • DOI
    10.1109/PAC.2001.988228
  • Filename
    988228