DocumentCode
379916
Title
Acceptance criteria and workmanship standards at Semicon Associates
Author
Effgen, Michael P.
Author_Institution
Semicon Associates, Lexington, KY, USA
fYear
2002
fDate
2002
Firstpage
234
Lastpage
235
Abstract
Presents a limited review of work accomplished by Semicon Associates in the project area of "Acceptance Criteria" for dispenser cathodes. This work was funded by Department of Defense Title III program office, and managed by the Manufacturing Technology Information Analysis Center operated by IIT Research Institute, for work specified in the Statement of Work entitled "Supply Chain Viability for the U.S. Microwave Tube Industry." The goal for the project was for Semicon Associates in conjunction with the Title III Vacuum Electron Device working group to jointly agree upon language, photographs and/or illustrations for inclusion in developing the industry standard and to promote consistent interpretation of product quality during and after manufacturing.
Keywords
cathodes; microwave tubes; quality control; standards; vacuum microelectronics; IIT Research Institute; Semicon Associates; acceptance criteria; dispenser cathodes; industry standard; microwave tube industry; product quality; supply chain viability; vacuum electron device; workmanship standards; Cathodes; Defense industry; Electron devices; Information analysis; Manufacturing industries; Microwave devices; Standards development; Supply chain management; Supply chains; Technology management;
fLanguage
English
Publisher
ieee
Conference_Titel
Vacuum Electronics Conference, 2002. IVEC 2002. Third IEEE International
Print_ISBN
0-7803-7256-5
Type
conf
DOI
10.1109/IVELEC.2002.999355
Filename
999355
Link To Document