DocumentCode
381047
Title
A flowshop scheduling algorithm to minimize total weighted completion time
Author
Zhao, Chuanli ; Zhang, QingLing ; Tang, Hengyong
Author_Institution
Coll. of Sci., Northeastern Univ., Shenyang, China
Volume
2
fYear
2002
fDate
2002
Firstpage
1485
Abstract
The paper considers the problem of minimizing total weighted completion time in a flowshop. A heuristic algorithm with worst-case bound m is given. For m = 2, if jobs have agreeable weights i.e. where pi ≤ pj implies wi ≥ wj, (i, j = 1, 2, ···, n). The worst-case bound is 2β/α+β, where α and β denote the minimum and maximum processing time of all operations. For some special cases, the polynomial algorithms are given.
Keywords
computational complexity; minimisation; production control; completion time total weighted minimization; flowshop scheduling algorithm; heuristic algorithm; maximum processing time; minimum processing time; polynomial algorithms; worst-case bound; Algorithm design and analysis; Approximation algorithms; Educational institutions; Heuristic algorithms; Job shop scheduling; Mathematics; Optimal scheduling; Polynomials; Processor scheduling; Scheduling algorithm;
fLanguage
English
Publisher
ieee
Conference_Titel
Intelligent Control and Automation, 2002. Proceedings of the 4th World Congress on
Print_ISBN
0-7803-7268-9
Type
conf
DOI
10.1109/WCICA.2002.1020831
Filename
1020831
Link To Document