• DocumentCode
    3812251
  • Title

    Discussion on ``Does it Pay the Average Coal Mine to Purchase Central Station Power?´´ (Bright), Pittsburgh, Pa., April 27, 1912

  • Author

    E. D. Dreyfus

  • Issue
    1
  • fYear
    1912
  • Firstpage
    748
  • Lastpage
    754
  • Keywords
    "Costs","Power generation","Voltage","Production","Substations","Propagation losses","Drives","Fluctuations","Investments","Concrete"
  • Journal_Title
    Transactions of the American Institute of Electrical Engineers
  • Publisher
    ieee
  • ISSN
    0096-3860
  • Type

    jour

  • DOI
    10.1109/T-AIEE.1912.4768446
  • Filename
    4768446