Discussion on ´Development and trials of the 400 kV integral pipe-cooled system´, ´Study of mechanical behaviour of cables in integral-pipe water-cooled systems´ and ´Design and construction of the 400 kV cable system for the Severn Tunnel´
Volume :
125
Issue :
10
fYear :
1978
fDate :
10/1/1978 12:00:00 AM
Firstpage :
1015
Lastpage :
1020
Journal_Title :
Proceedings of the Institution of Electrical Engineers