• DocumentCode
    3836472
  • Title

    Discussion on "The operation, maintenance and testing of overhead lines and associated outdoor equipment on a.c. systems" before the South Midland Centre, at Birmingham, 5th February, 1945

  • Volume
    92
  • Issue
    30
  • fYear
    1945
  • fDate
    12/1/1945 12:00:00 AM
  • Firstpage
    618
  • Lastpage
    620
  • Journal_Title
    Journal of the Institution of Electrical Engineers - Part II: Power Engineering
  • Publisher
    iet
  • Type

    jour

  • DOI
    10.1049/ji-2.1945.0151
  • Filename
    5295508