• DocumentCode
    3836828
  • Title

    Discussion on ´Centralized ripple control on high-voltage networks´ before the North-Western Transmission Group, at Manchester, 24th February, 1948

  • Volume
    95
  • Issue
    47
  • fYear
    1948
  • fDate
    10/1/1948 12:00:00 AM
  • Firstpage
    485
  • Lastpage
    488
  • Journal_Title
    Journal of the Institution of Electrical Engineers - Part II: Power Engineering
  • Publisher
    iet
  • Type

    jour

  • DOI
    10.1049/ji-2.1948.0128
  • Filename
    5296853