• DocumentCode
    384664
  • Title

    Developing the International Space Station integrated verification measurement program

  • Author

    Haskins, Bill R.

  • Author_Institution
    Boeing Co., Houston, TX, USA
  • Volume
    2
  • fYear
    2002
  • fDate
    2002
  • Abstract
    The International Space Station (ISS) Program Master Integration and Verification Plan (PMI&VP) requires that the systems engineering verification team establish and implement an integrated verification measurement program. This paper captures the knowledge and experience acquired through the International Space Station systems engineering efforts to develop, implement, and report a detailed set of integrated stage verification planning and closure metrics. The information and lessons learned, contained in this paper, may provide insight, direction, and a starting point for other large engineering organizations seeking to institute a measurement program.
  • Keywords
    aerospace testing; space vehicles; systems engineering; International Space Station; closure metric; integrated verification measurement program; planning metric; systems engineering; Control systems; Engineering management; Extraterrestrial measurements; International Space Station; Kelvin; Knowledge engineering; Personnel; Quality management; Space stations; Systems engineering and theory;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Digital Avionics Systems Conference, 2002. Proceedings. The 21st
  • Print_ISBN
    0-7803-7367-7
  • Type

    conf

  • DOI
    10.1109/DASC.2002.1052950
  • Filename
    1052950