DocumentCode
384664
Title
Developing the International Space Station integrated verification measurement program
Author
Haskins, Bill R.
Author_Institution
Boeing Co., Houston, TX, USA
Volume
2
fYear
2002
fDate
2002
Abstract
The International Space Station (ISS) Program Master Integration and Verification Plan (PMI&VP) requires that the systems engineering verification team establish and implement an integrated verification measurement program. This paper captures the knowledge and experience acquired through the International Space Station systems engineering efforts to develop, implement, and report a detailed set of integrated stage verification planning and closure metrics. The information and lessons learned, contained in this paper, may provide insight, direction, and a starting point for other large engineering organizations seeking to institute a measurement program.
Keywords
aerospace testing; space vehicles; systems engineering; International Space Station; closure metric; integrated verification measurement program; planning metric; systems engineering; Control systems; Engineering management; Extraterrestrial measurements; International Space Station; Kelvin; Knowledge engineering; Personnel; Quality management; Space stations; Systems engineering and theory;
fLanguage
English
Publisher
ieee
Conference_Titel
Digital Avionics Systems Conference, 2002. Proceedings. The 21st
Print_ISBN
0-7803-7367-7
Type
conf
DOI
10.1109/DASC.2002.1052950
Filename
1052950
Link To Document