    765 kV system introduction to Korean power system

  • Author

    Kim, Taeok ; Moon, Bongsoo ; Chang, Jaewon

  • Author_Institution
    Korea Electr. Power Corp., Seoul, South Korea
  • Volume
    2
  • fYear
    2002
  • fDate
    6-10 Oct. 2002
  • Firstpage
    988
  • Abstract
    A 765 kV system was introduced to the Korean power system. Two transmission lines were completed in 2000 and 2001, respectively and they operated as 345 kV lines until the 765 kV substation completion at the end of 2001. We performed test runs until April 2002 for the line and substations, when commercial operation was due to begin. System prospects at the time of the feasibility study, system characteristics obtained from simulations for various operating conditions are shown in this paper. Future operation planning is also discussed.
  • Keywords
    power systems; power transmission lines; substations; 345 kV; 765 kV; Korean power system; future operation planning; simulations; substation completion; transmission lines; Circuit faults; Demand forecasting; Distributed parameter circuits; Power generation; Power system planning; Power systems; Power transmission lines; Substations; Supply and demand; Voltage;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Transmission and Distribution Conference and Exhibition 2002: Asia Pacific. IEEE/PES
  • Print_ISBN
    0-7803-7525-4
  • Type

    conf

  • DOI
    10.1109/TDC.2002.1177611
  • Filename
    1177611