• DocumentCode
    397218
  • Title

    Considerations into the change of the distribution power system grounding

  • Author

    Todde, C. ; Rey, A. ; Grangier, M.

  • Author_Institution
    Enterprises Electriques Fribourgeoises, Fribourg, Switzerland
  • Volume
    1
  • fYear
    2003
  • fDate
    4-7 May 2003
  • Firstpage
    599
  • Abstract
    The grounding system became an important factor in the electrification of the large power systems in the early ´20s, conditioning the choice of the system operation. In recent years, the energy service to the customers and the safety of the persons has become a major concern for the electric utilities. In some contingency cases, a fault can generate a ground potential rise compromising the service quality and the field team security. In this paper, we analyse a case of study, which is the 18 kV-distribution system of the Entreprises Electriques Fribourgeoises (EEF), a private utility in West Switzerland. A methodology is proposed to identify the unacceptable ground potential rise and to limit the customer interruptions. An optimisation, based on technical and legal matters, is then carried out to determine the appropriate improvement of the existing grounding system.
  • Keywords
    earthing; optimisation; power distribution faults; power distribution reliability; 18 kV; Entreprises Electriques Fribourgeoises; electric utilities; electrification; field team security; large power systems; power distribution system; power system grounding; service quality; Cables; Electrical fault detection; Grounding; Power industry; Power system faults; Power system protection; Power system relaying; Power system stability; Power systems; Voltage;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electrical and Computer Engineering, 2003. IEEE CCECE 2003. Canadian Conference on
  • ISSN
    0840-7789
  • Print_ISBN
    0-7803-7781-8
  • Type

    conf

  • DOI
    10.1109/CCECE.2003.1226467
  • Filename
    1226467