DocumentCode
397931
Title
Process monitoring via independent components
Author
Shannon, Thaddeus T. ; Abercrombie, David ; McNames, James
Author_Institution
Syst. Sci. Program, Portland State Univ., OR, USA
Volume
4
fYear
2003
fDate
5-8 Oct. 2003
Firstpage
3496
Abstract
We propose a method for process monitoring of a semiconductor manufacturing process. Independent component analysis (ICA) is applied to characterize E-test parameter data. We calculate angular confidence intervals for the model, eliminate marginally significant components and implement control charts for significant components of interest. Alarms are generated off of deviations in the charted components. Alarms are easily used in process diagnosis based on the interpretation of the independent components.
Keywords
control charts; independent component analysis; parameter estimation; process monitoring; semiconductor device manufacture; statistical process control; E-test parameter data; Independent component analysis; alarms; angular confidence intervals; control charts; independent components; process diagnosis; process monitoring; semiconductor manufacturing process; statistical process control; Circuit testing; Computerized monitoring; Independent component analysis; Manufacturing processes; Mutual information; Principal component analysis; Process control; Production; Random variables; Semiconductor device manufacture;
fLanguage
English
Publisher
ieee
Conference_Titel
Systems, Man and Cybernetics, 2003. IEEE International Conference on
ISSN
1062-922X
Print_ISBN
0-7803-7952-7
Type
conf
DOI
10.1109/ICSMC.2003.1244430
Filename
1244430
Link To Document