DocumentCode :
401582
Title :
A finite horizon control and scheduling model for a failure-prone manufacturing hybrid system based on optimal inventory
Author :
Liu, Jun ; Song, Cwn-we ; Li, Ping
Author_Institution :
Inst. of Ind. Process Control, Zhejiang Univ., Hangzhou, China
Volume :
2
fYear :
2003
fDate :
2-5 Nov. 2003
Firstpage :
830
Abstract :
An optimal production and scheduling model is discussed for a general failure-prone inflexible manufacturing system with Markov disturbances. The system can produce several types of products, but at any given time it can only produce several type of products. A setup (with setup time or cost or both) is required if production is to be switched from one type of product to another. The objective of the problem is to minimize the costs of setup, production and inventory. On the basis of a necessary and sufficient condition for optimal control, we give a new general production policy based on optimal inventory. After we discuss a new scheduling policy, a new dynamic programming is presented.
Keywords :
Markov processes; dynamic programming; manufacturing systems; optimal control; production planning; scheduling; stock control; Markov disturbances; dynamic programming; failure-prone inflexible manufacturing system; finite horizon control; general production policy; optimal control; optimal inventory; optimal production; production planning; scheduling model; scheduling policy; setup time; Costs; Infinite horizon; Iterative algorithms; Job shop scheduling; Manufacturing systems; Optimal control; Production systems; Scheduling algorithm; Sufficient conditions; Virtual manufacturing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Machine Learning and Cybernetics, 2003 International Conference on
Print_ISBN :
0-7803-8131-9
Type :
conf
DOI :
10.1109/ICMLC.2003.1259593
Filename :
1259593
Link To Document :
بازگشت