    Early estimation of the size of VHDL projects

  • Author

    Fornaciari, William ; Salice, Fabio ; Scarpazza, Daniele Paolo

  • Author_Institution
    Politecnico di Milano, Italy
  • fYear
    2003
  • fDate
    1-3 Oct. 2003
  • Firstpage
    207
  • Lastpage
    212
  • Abstract
    The analysis of the amount of human resources required to complete a project is felt as a critical issue in any company of the electronics industry. In particular, early estimation of the effort involved in a development process is a key requirement for any cost-driven system-level design decision. In this paper, we present a methodology to predict the final size of a VHDL project on the basis of a high-level description, obtaining a significant indication about the development effort. The methodology is the composition of a number of specialized models, tailored to estimate the size of specific component types. Models were trained and tested on two disjoint and large sets of real VHDL projects. Quality-of-result indicators show that the methodology is both accurate and robust.
  • Keywords
    hardware description languages; hardware-software codesign; project management; systems analysis; VHDL analysis; VHDL code; VHDL size estimation; Verilog hardware description languages; cost estimation; cost-driven system-level design; design metrics; development-by-refinement design process; embedded system; high-level description; quality-of-result indicator; robustness; Costs; Embedded system; Hardware; Humans; Permission; Robustness; Software engineering; Software measurement; System-level design; Testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Hardware/Software Codesign and System Synthesis, 2003. First IEEE/ACM/IFIP International Conference on
  • Conference_Location
    Newport Beach, CA, USA
  • Print_ISBN
    1-58113-742-7
  • Type

    conf

  • DOI
    10.1109/CODESS.2003.1275285
  • Filename
    1275285