DocumentCode :
408069
Title :
Motion planning of fork lift group in warehouse management - dynamical scheduling of arrangement work
Author :
Hara, Tenshi ; Higashi, Toshimitsu ; Ota, Jun ; Tamura, Hirofumi
Author_Institution :
Dept. of Precision Machinery Eng., Tokyo Univ., Japan
Volume :
1
fYear :
2003
fDate :
8-13 Oct. 2003
Firstpage :
312
Abstract :
In this paper, as the first step of managing both storagability and operatability in the floor warehouse, we deal with a scheduling for assignment of forklifts on an arrangement work. We propose an algorithm that calculates a semi-optimal solution in practical time for this problem. This algorithm bases on simulated annealing and consists of three layers with a different search domain. We also propose methods of online re-planning against the model error in offline plan stage, and the uncertainty of human work. The validity of our method is verified in simulation.
Keywords :
dynamic scheduling; fork lift trucks; path planning; search problems; simulated annealing; warehousing; dynamical scheduling; floor warehouse management; fork lift motion planning; online replanning; realtime scheduling; search domain; semioptimal solution; simulated annealing; stacker crane problem; Automatic speech recognition; Control systems; Costs; Dynamic scheduling; Job shop scheduling; Machinery; Material storage; Materials handling; Simulated annealing; Storage automation;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Robotics, Intelligent Systems and Signal Processing, 2003. Proceedings. 2003 IEEE International Conference on
Print_ISBN :
0-7803-7925-X
Type :
conf
DOI :
10.1109/RISSP.2003.1285593
Filename :
1285593
Link To Document :
بازگشت