DocumentCode
408534
Title
Operational performance of the SNS LLRF interim system
Author
Doolittle, Lawrence ; Ratti, Alessandro ; Monroy, Marco ; Champion, Mark ; Ma, Hengjie
Author_Institution
Lawrence Berkeley Nat. Lab., CA, USA
Volume
3
fYear
2003
fDate
12-16 May 2003
Firstpage
1464
Abstract
A new approach has been taken to develop and build the Low-Level RF Control System for the SNS Front End and Linear Accelerators, as reported in a separate paper in this conference. An interim version, based on the proven LBNL MEBT design, was constructed to support short-term goals and early commissioning of the Front End RFQ and DTL accelerators, while the final system is under development. Additional units of the interim system are in use at JLab and LANL for concept testing, code development, and commissioning of SNS SRF cryomodules. The conceptual design of the MEBT system had already been presented elsewhere, and this paper will address operational experiences and performance measurements with the existing interim system hardware, including commissioning results at the SNS site for the Front End and DTL Tank 3 together with operational results from the JLab test stand.
Keywords
accelerator RF systems; linear accelerators; neutron sources; LBNL MEBT design; SNS LLRF interim system; linear accelerators; low-level RF control system; Contracts; Control systems; Field programmable gate arrays; Hardware; Laboratories; Linear accelerators; Printed circuits; Radio frequency; System testing; Voltage-controlled oscillators;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2003. PAC 2003. Proceedings of the
ISSN
1063-3928
Print_ISBN
0-7803-7738-9
Type
conf
DOI
10.1109/PAC.2003.1288562
Filename
1288562
Link To Document