• DocumentCode
    408534
  • Title

    Operational performance of the SNS LLRF interim system

  • Author

    Doolittle, Lawrence ; Ratti, Alessandro ; Monroy, Marco ; Champion, Mark ; Ma, Hengjie

  • Author_Institution
    Lawrence Berkeley Nat. Lab., CA, USA
  • Volume
    3
  • fYear
    2003
  • fDate
    12-16 May 2003
  • Firstpage
    1464
  • Abstract
    A new approach has been taken to develop and build the Low-Level RF Control System for the SNS Front End and Linear Accelerators, as reported in a separate paper in this conference. An interim version, based on the proven LBNL MEBT design, was constructed to support short-term goals and early commissioning of the Front End RFQ and DTL accelerators, while the final system is under development. Additional units of the interim system are in use at JLab and LANL for concept testing, code development, and commissioning of SNS SRF cryomodules. The conceptual design of the MEBT system had already been presented elsewhere, and this paper will address operational experiences and performance measurements with the existing interim system hardware, including commissioning results at the SNS site for the Front End and DTL Tank 3 together with operational results from the JLab test stand.
  • Keywords
    accelerator RF systems; linear accelerators; neutron sources; LBNL MEBT design; SNS LLRF interim system; linear accelerators; low-level RF control system; Contracts; Control systems; Field programmable gate arrays; Hardware; Laboratories; Linear accelerators; Printed circuits; Radio frequency; System testing; Voltage-controlled oscillators;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 2003. PAC 2003. Proceedings of the
  • ISSN
    1063-3928
  • Print_ISBN
    0-7803-7738-9
  • Type

    conf

  • DOI
    10.1109/PAC.2003.1288562
  • Filename
    1288562