Author :
Ikegami, M. ; Kato, T. ; Igarashi, Z. ; Yamaguchi, S. ; Ueno, A. ; Ikegami, K. ; Okada, M. ; Kubota, C. ; Yoshino, K. ; Nigorikawa, K. ; Kadokura, E. ; Kawamura, M. ; Fukui, Y. ; Kamikubota, N. ; Naito, F. ; Tanaka, H. ; Noguchi, S. ; Fukuda, S. ; Takasak
Abstract :
The construction of the initial part of the J-PARC linac has been started at KEK for beam tests before moving to the JAERI Tokai campus, where J-PARC facility is finally to be constructed. The RFQ and MEBT (Medium Energy Beam Transport) have already been installed at KEK, and the beam test has been performed successfully. In this paper, the experimental results of the beam tests are presented together with simulation results with a 3D PIC (Particle-In-Cell) code.
Keywords :
beam handling equipment; linear accelerators; particle beam dynamics; 3D PIC code; J-PARC linac medium energy beam transport; KEK; MEBT; RFQ; beam commissioning; radiofrequency quadrupole; Current transformers; Indium tin oxide; Ion accelerators; Ion sources; Linear particle accelerator; Monitoring; Particle accelerators; Particle beams; Proton accelerators; Testing;