DocumentCode :
408593
Title :
Initial operation of the Fermilab MiniBooNE beamline
Author :
Moore, C. ; Anderson, J., Jr. ; Ducar, R. ; Ford, R. ; Kobilarcik, T. ; Prebys, E. ; Russell, A. ; Stenfanski, R. ; Monroe, J.
Author_Institution :
Fermi Nat. Accel. Lab., USA
Volume :
3
fYear :
2003
fDate :
12-16 May 2003
Firstpage :
1652
Abstract :
The MiniBooNE neutrino experiment is projected to take more intensity in a single year than was delivered during the seventeen years of running the Fixed Target Program. The experiment will require almost continuous running (18,000 pulses/hour) at full intensity (5E12 protons per pulse). In order to safely handle this intensity various measures have been instituted. The design of the beamline ensures sufficient clearance between the beam and apertures. A MiniBooNE Beam Permit System has been installed that is able to check various digital and analogue information against nominal values on a pulse by pulse basis. An automated total beam loss monitoring system (electronic berm) measures any beam loss between the beginning and end of the line. An automated correction system (Autotune) finds and corrects minor beam wandering. A description of the beamline design and relevant instrumentation is given.
Keywords :
beam handling equipment; beam handling techniques; particle beam diagnostics; Fermilab MiniBooNE beamline; MiniBooNE Beam Permit System; MiniBooNE neutrino experiment; automated correction system; automated total beam loss monitoring system; beamline design; Apertures; Dispersion; Loss measurement; Monitoring; Neutrino sources; Particle beams; Position measurement; Protons; Size measurement; Trajectory;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 2003. PAC 2003. Proceedings of the
ISSN :
1063-3928
Print_ISBN :
0-7803-7738-9
Type :
conf
DOI :
10.1109/PAC.2003.1288625
Filename :
1288625
Link To Document :
بازگشت