DocumentCode :
408606
Title :
Commissioning of a first-order transition jump in RHIC
Author :
Kewisch, Jörg ; Montag, Christoph
Author_Institution :
Brookhaven Nat. Lab., Upton, NY, USA
Volume :
3
fYear :
2003
fDate :
12-16 May 2003
Firstpage :
1694
Abstract :
When accelerating gold ions in the Relativistic Heavy Ion Collider (RHIC) the transition energy must be crossed. RHIC uses a set of special quadrupoles and power supplies which can reverse polarity in less than 40 milliseconds. These quadrupoles are used to produce dispersion bumps which increase the transition energy as the beam approaches transition. The change of polarity will then jump the transition energy across the beam energy. This paper describes the commissioning of the RHIC transition crossing system.
Keywords :
beam handling techniques; ion accelerators; particle beam diagnostics; storage rings; synchrotrons; RHIC; RHIC transition crossing system; Relativistic Heavy Ion Collider; accelerating gold ions; beam energy; dispersion bumps; first-order transition jump; polarity; power supplies; special quadrupoles; transition energy; Acceleration; Capacitors; Frequency; Gold; Insulated gate bipolar transistors; Power supplies; Protons; Storage rings; Switches; Voltage;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 2003. PAC 2003. Proceedings of the
ISSN :
1063-3928
Print_ISBN :
0-7803-7738-9
Type :
conf
DOI :
10.1109/PAC.2003.1288639
Filename :
1288639
Link To Document :
بازگشت