DocumentCode :
408610
Title :
Commissioning of RHIC deuteron-gold collisions
Author :
Satogata, T. ; Ahrens, L. ; Bai, M. ; Beebe-Wang, J. ; Blaskiewicz, M. ; Brennan, J.M. ; Brown, K.A. ; Bruno, D. ; Cameron, P.P. ; Cardona, J. ; Connolly, R. ; Drees, A. ; Fischer, W. ; Fliller, R.P. ; Ganetis, G. ; Gardner, C. ; Glenn, J.W. ; Hahn, H.H.
Author_Institution :
Brookhaven Nat. Lab., Upton, NY, USA
Volume :
3
fYear :
2003
fDate :
12-16 May 2003
Firstpage :
1706
Abstract :
Deuteron and gold beams have been accelerated to a collision energy of √s = 200 GeV/u in the Relativistic Heavy Ion Collider (RHIC), providing the first asymmetric-species collisions of this complex. Necessary changes for this mode of operation include new ramping software and asymmetric crossing angle geometries. This paper reviews machine performance, problems encountered and their solutions, and accomplishments during the 16 weeks of ramp-up and operations.
Keywords :
beam handling techniques; colliding beam accelerators; ion accelerators; particle beam diagnostics; storage rings; synchrotrons; RHIC deuteron-gold collisions; Relativistic Heavy Ion Collider; asymmetric crossing angle geometries; asymmetric-species collisions; collision energy; machine performance; review; Acceleration; Colliding beam accelerators; Colliding beam devices; Energy storage; Gold; Laboratories; Particle beams; Physics; Power supplies; Probes;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 2003. PAC 2003. Proceedings of the
ISSN :
1063-3928
Print_ISBN :
0-7803-7738-9
Type :
conf
DOI :
10.1109/PAC.2003.1288643
Filename :
1288643
Link To Document :
بازگشت