Author :
Satogata, T. ; Ahrens, L. ; Bai, M. ; Beebe-Wang, J. ; Blaskiewicz, M. ; Brennan, J.M. ; Brown, K.A. ; Bruno, D. ; Cameron, P.P. ; Cardona, J. ; Connolly, R. ; Drees, A. ; Fischer, W. ; Fliller, R.P. ; Ganetis, G. ; Gardner, C. ; Glenn, J.W. ; Hahn, H.H.
Author_Institution :
Brookhaven Nat. Lab., Upton, NY, USA
Abstract :
Deuteron and gold beams have been accelerated to a collision energy of √s = 200 GeV/u in the Relativistic Heavy Ion Collider (RHIC), providing the first asymmetric-species collisions of this complex. Necessary changes for this mode of operation include new ramping software and asymmetric crossing angle geometries. This paper reviews machine performance, problems encountered and their solutions, and accomplishments during the 16 weeks of ramp-up and operations.
Keywords :
beam handling techniques; colliding beam accelerators; ion accelerators; particle beam diagnostics; storage rings; synchrotrons; RHIC deuteron-gold collisions; Relativistic Heavy Ion Collider; asymmetric crossing angle geometries; asymmetric-species collisions; collision energy; machine performance; review; Acceleration; Colliding beam accelerators; Colliding beam devices; Energy storage; Gold; Laboratories; Particle beams; Physics; Power supplies; Probes;