DocumentCode
408610
Title
Commissioning of RHIC deuteron-gold collisions
Author
Satogata, T. ; Ahrens, L. ; Bai, M. ; Beebe-Wang, J. ; Blaskiewicz, M. ; Brennan, J.M. ; Brown, K.A. ; Bruno, D. ; Cameron, P.P. ; Cardona, J. ; Connolly, R. ; Drees, A. ; Fischer, W. ; Fliller, R.P. ; Ganetis, G. ; Gardner, C. ; Glenn, J.W. ; Hahn, H.H.
Author_Institution
Brookhaven Nat. Lab., Upton, NY, USA
Volume
3
fYear
2003
fDate
12-16 May 2003
Firstpage
1706
Abstract
Deuteron and gold beams have been accelerated to a collision energy of √s = 200 GeV/u in the Relativistic Heavy Ion Collider (RHIC), providing the first asymmetric-species collisions of this complex. Necessary changes for this mode of operation include new ramping software and asymmetric crossing angle geometries. This paper reviews machine performance, problems encountered and their solutions, and accomplishments during the 16 weeks of ramp-up and operations.
Keywords
beam handling techniques; colliding beam accelerators; ion accelerators; particle beam diagnostics; storage rings; synchrotrons; RHIC deuteron-gold collisions; Relativistic Heavy Ion Collider; asymmetric crossing angle geometries; asymmetric-species collisions; collision energy; machine performance; review; Acceleration; Colliding beam accelerators; Colliding beam devices; Energy storage; Gold; Laboratories; Particle beams; Physics; Power supplies; Probes;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2003. PAC 2003. Proceedings of the
ISSN
1063-3928
Print_ISBN
0-7803-7738-9
Type
conf
DOI
10.1109/PAC.2003.1288643
Filename
1288643
Link To Document