• DocumentCode
    408610
  • Title

    Commissioning of RHIC deuteron-gold collisions

  • Author

    Satogata, T. ; Ahrens, L. ; Bai, M. ; Beebe-Wang, J. ; Blaskiewicz, M. ; Brennan, J.M. ; Brown, K.A. ; Bruno, D. ; Cameron, P.P. ; Cardona, J. ; Connolly, R. ; Drees, A. ; Fischer, W. ; Fliller, R.P. ; Ganetis, G. ; Gardner, C. ; Glenn, J.W. ; Hahn, H.H.

  • Author_Institution
    Brookhaven Nat. Lab., Upton, NY, USA
  • Volume
    3
  • fYear
    2003
  • fDate
    12-16 May 2003
  • Firstpage
    1706
  • Abstract
    Deuteron and gold beams have been accelerated to a collision energy of √s = 200 GeV/u in the Relativistic Heavy Ion Collider (RHIC), providing the first asymmetric-species collisions of this complex. Necessary changes for this mode of operation include new ramping software and asymmetric crossing angle geometries. This paper reviews machine performance, problems encountered and their solutions, and accomplishments during the 16 weeks of ramp-up and operations.
  • Keywords
    beam handling techniques; colliding beam accelerators; ion accelerators; particle beam diagnostics; storage rings; synchrotrons; RHIC deuteron-gold collisions; Relativistic Heavy Ion Collider; asymmetric crossing angle geometries; asymmetric-species collisions; collision energy; machine performance; review; Acceleration; Colliding beam accelerators; Colliding beam devices; Energy storage; Gold; Laboratories; Particle beams; Physics; Power supplies; Probes;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 2003. PAC 2003. Proceedings of the
  • ISSN
    1063-3928
  • Print_ISBN
    0-7803-7738-9
  • Type

    conf

  • DOI
    10.1109/PAC.2003.1288643
  • Filename
    1288643