• DocumentCode
    408677
  • Title

    Status of the LHC main dipole pre-series production

  • Author

    Modena, M. ; Bajko, M. ; Cornelis, M. ; Fessia, P. ; Miles, J. ; Pugnat, P. ; Rinn, J. ; de Rijk, G. ; Savary, F. ; Siemko, A. ; Todesco, E. ; Vlogaert, J.

  • Author_Institution
    Div. of Accel. Technol., CERN, Geneva, Switzerland
  • Volume
    3
  • fYear
    2003
  • fDate
    12-16 May 2003
  • Firstpage
    1942
  • Abstract
    The procurement of a pre-series of 90 Main Dipole was decided as the first step towards the series production of 1232 Arc Main Dipoles within the LHC magnet program. The pre-series production is already completed at one Contractor´s site and is approaching the completion at the other two companies. Technical aspects: manufacturing tolerances, manufacturing difficulties, first evaluation on Non-Conformities appearing during production and a short overview of magnet performance are presented.
  • Keywords
    accelerator magnets; proton accelerators; synchrotrons; 1232 Arc Main Dipoles; 90 Main Dipole preseries procurement; LHC magnet program; LHC main dipole preseries production; contractor site; magnet performance; manufacturing difficulties; manufacturing tolerances; nonconformities; technical aspects; Accelerator magnets; Coils; Conductors; Contracts; Large Hadron Collider; Magnetic heads; Manufacturing; Notice of Violation; Procurement; Production;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 2003. PAC 2003. Proceedings of the
  • ISSN
    1063-3928
  • Print_ISBN
    0-7803-7738-9
  • Type

    conf

  • DOI
    10.1109/PAC.2003.1288729
  • Filename
    1288729