DocumentCode :
408740
Title :
High luminosity operation of the Fermilab accelerator complex
Author :
Mishra, S.
Author_Institution :
Fermi Nat. Accel. Lab., USA
Volume :
1
fYear :
2003
fDate :
12-16 May 2003
Firstpage :
1
Abstract :
Run-II at Fermilab is progressing steadily. In the Run-II scheme, 36 antiproton bunches collide with 36 proton bunches at the CDF and Do interaction regions in the Tevatron at 980 GeV per beam. The current status and performance of the Fermilab Accelerator complex is reviewed. The plan for Run-II, accelerator upgrades and integration of the Recycler in the accelerator chain will be presented.
Keywords :
colliding beam accelerators; commissioning; particle beam bunching; particle beam injection; proton sources; storage rings; 980 GeV; CDF interaction regions; D0 interaction regions; Fermilab accelerator complex; Run-II scheme; Tevatron; accelerator upgrades; antiproton bunches; antiproton source; colliding beam accelerator; commissioning; high luminosity operation; main injector; proton bunches; proton source; recycler integration; Acceleration; Colliding beam accelerators; Ion accelerators; Lattices; Linear particle accelerator; Particle beams; Permanent magnets; Physics; Production; Proton accelerators;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 2003. PAC 2003. Proceedings of the
ISSN :
1063-3928
Print_ISBN :
0-7803-7738-9
Type :
conf
DOI :
10.1109/PAC.2003.1288826
Filename :
1288826
Link To Document :
بازگشت