SPEAR 3 upgrade project: the final year
Author
Hettel, R. ; Akre, R. ; Allison, S. ; Bellomo, P. ; Boyce, R. ; Cadapan, L. ; Cassel, R. ; Choi, B. ; Corbett, W. ; Dell´Orco, D. ; Elioff, T. ; Evans, I. ; Fuller, R. ; Hill, A. ; Keeley, D. ; Kurita, N. ; Langton, J. ; Leyh, G. ; Limborg, C. ; Macnair,
Author_Institution
Linear Accel. Center, Stanford Univ., CA, USA
Volume
1
fYear
2003
fDate
12-16 May 2003
Firstpage
235
Abstract
During April, 2003, the SPEAR 2 storage ring, which served the high energy physics community from 1972 to 1987, and the synchrotron radiation community for an additional 15 years, was removed from its shielding tunnel in order to install the new 3-GeV, 500-mA SPEAR 3 light source. From May to November, SSRL will excavate the tunnel floor and pour a new concrete floor, and then install pre-assembled girders holding magnets, copper vacuum chambers, PEP-II-style rf cavities, and beam line front end components. At the same time, power supply, instrumentation and control, and other ancillary systems will be configured, leading to a commissioning period beginning in November 2003. The progress of accelerator component implementation and installation during the final year of the project will be reviewed.
Keywords
accelerator RF systems; accelerator magnets; light sources; storage rings; synchrotron radiation; 3 GeV; 500 mA; SPEAR 3 upgrade project; beam line front end components; concrete floor; control; instrumentation; power supply; rf cavities; storage ring; synchrotron radiation; tunnel floor; Concrete; Copper; Floors; Instruments; Light sources; Magnets; Power supplies; Storage rings; Structural beams; Synchrotron radiation;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2003. PAC 2003. Proceedings of the
ISSN
1063-3928
Print_ISBN
0-7803-7738-9
Type
conf
DOI
10.1109/PAC.2003.1288888
Filename
1288888
Link To Document