• DocumentCode
    409154
  • Title

    Vacuum systems renewal for the PF-AR upgrade

  • Author

    Tanimoto, Y. ; Uchiyama, T. ; Nogami, T. ; Hori, Y.

  • Author_Institution
    KEK, Tsukuba, Japan
  • Volume
    2
  • fYear
    2003
  • fDate
    12-16 May 2003
  • Firstpage
    809
  • Abstract
    The Photon Factory Advanced Ring (PF-AR) at the High Energy Accelerator Research Organization (KEK) was upgraded to improve performance. Vacuum systems were almost thoroughly redesigned and renewed to realize longer beam lifetime, higher stored current, and more reliable operation. Replacement of vacuum components was carried out in 2001. And the commissioning started in January 2002. After one-year operation, the beam lifetime grew 7 times longer than that of the former PF-AR.
  • Keywords
    beam handling techniques; electron accelerators; particle beam dynamics; particle beam stability; storage rings; PF-AR upgrade; Photon Factory Advanced Ring; beam lifetime; stored current; vacuum components; vacuum systems; Control systems; Ducts; Laser excitation; Light sources; Magnets; Pressure control; Strontium; Temperature control; Thermal loading; Vacuum systems;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 2003. PAC 2003. Proceedings of the
  • ISSN
    1063-3928
  • Print_ISBN
    0-7803-7738-9
  • Type

    conf

  • DOI
    10.1109/PAC.2003.1289485
  • Filename
    1289485