The RF power delivery system design and its component characterization for PEFP DTL
Author
Kwon, H.J. ; Cho, Y.S. ; Jeong, K.K. ; Man, J.M. ; Choi, B.H.
Author_Institution
Korea Adv. Energy Res. Inst., Daejeon, South Korea
Volume
2
fYear
2003
fDate
12-16 May 2003
Firstpage
1222
Abstract
The PEFP (Proton Engineering Frontier Project) was started at September 2002 whose main goals are to construct 100 MeV proton accelerator and develop beam utilization areas. In this project, 20 MeV DTL is scheduled to be constructed and tested within three fiscal years. The RF power delivery system for 20 MeV DTL was designed and its components were characterized at PEFP, KAERI. The RF power from a 350 MHz, 1 MW klystron is split into four legs to drive four tanks of the 20 MeV DTL. Each leg has a phase shifter to adjust the phase of the RF field in each tank. The design of the RF power delivery system of the 100 MeV accelerator will be based on experiences of the 20 MeV DTL RF system development.
Keywords
accelerator RF systems; klystrons; linear accelerators; particle beam dynamics; proton accelerators; 1 MW; 100 MeV; 20 MeV; 350 MHz; PEFP DTL; Proton Engineering Frontier Project; RF power delivery system design; component characterization; drift tube linac; klystron; phase shifter; proton accelerator; Klystrons; Leg; Particle beams; Phase shifters; Power supplies; Proton accelerators; Radio frequency; Structural beams; Thyristors; Voltage control;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2003. PAC 2003. Proceedings of the
ISSN
1063-3928
Print_ISBN
0-7803-7738-9
Type
conf
DOI
10.1109/PAC.2003.1289659
Filename
1289659
Link To Document