DocumentCode :
409299
Title :
TRIUMF ISAC RF system improvements after 2 years of operational experience
Author :
Bylinskii, I. ; Ang, Z. ; Fang, S. ; Fong, K. ; Kumaran, R. ; Lu, J. ; Poirier, R.
Author_Institution :
TRIUMF, Vancouver, BC, Canada
Volume :
2
fYear :
2003
fDate :
12-16 May 2003
Firstpage :
1285
Abstract :
The TRIUMF ISAC accelerator has been successfully operating since spring 2001 with very little downtime. The machine comprises 16 independent RF systems including a 35 MHz RFQ, a 106 MHz DTL and several sub-harmonic choppers and bunchers. The post stripper DTL enables fully variable output energy up to 1.5 MeV/u for rare isotopes with A/q<6 in cw mode. This sets rather stringent requirements for the RF system as a whole and the RF controls in particular. A new RF phase measuring system has been commissioned, which together with other modifications has improved machine tunability. During initial operation the DTL frequency tuners and power couplers showed some problems, which could affect the machine reliability. Modifications to these components together with additional diagnostics have solved these problems. In this paper we will describe the overall operation of the RF system and present details of the modifications.
Keywords :
accelerator RF systems; linear accelerators; particle beam bunching; particle beam diagnostics; particle beam dynamics; proton accelerators; 106 MHz; 35 MHz; DTL frequency tuners; RF controls; RFQ; TRIUMF ISAC RF system; TRIUMF ISAC accelerator; bunchers; cw mode; machine tunability; power couplers; rare isotopes; subharmonic choppers; Acceleration; Ceramics; Choppers; Isotopes; Linear particle accelerator; Maintenance; Phase measurement; Radio frequency; Soldering; Springs;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 2003. PAC 2003. Proceedings of the
ISSN :
1063-3928
Print_ISBN :
0-7803-7738-9
Type :
conf
DOI :
10.1109/PAC.2003.1289680
Filename :
1289680
Link To Document :
بازگشت