• DocumentCode
    416571
  • Title

    Imprecise computation technique to schedule AND/OR tasks with global end-to-end deadline in distributed real-time systems

  • Author

    El-Haweet, W.A. ; El-Meligy, H.H. ; El-Salam, I. Abd

  • Author_Institution
    Dept. of Comput. Sci. & Autom. Control, Alexandria Univ., Egypt
  • Volume
    1
  • fYear
    2003
  • fDate
    4-6 Aug. 2003
  • Firstpage
    663
  • Abstract
    Directed acyclic graphs (DAGs) are used to represent AND/OR precedence constraint systems where AND tasks are ready to execute when all of their direct predecessors are completed and OR tasks are ready to execute when one or more but not necessarily all of their direct predecessors are completed. A proposed imprecise computation technique ICT is introduced to maximize the solution quality within the available time. To examine and evaluate ICT, a random graph generator algorithm (RGG) is created to provide a wide range of random DAGs to be used in the simulation experiments.
  • Keywords
    constraint handling; directed graphs; processor scheduling; real-time systems; AND/OR precedence constraint systems; directed acyclic graphs; distributed real-time systems; global end-to-end deadline; imprecise computation technique; real-time scheduling; simple flexible scheduling model;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    SICE 2003 Annual Conference
  • Conference_Location
    Fukui, Japan
  • Print_ISBN
    0-7803-8352-4
  • Type

    conf

  • Filename
    1323449