DocumentCode
428596
Title
Proposal of a performance measurement system for the evaluation of scheduling solutions
Author
Terzi, Sergio ; Cavalieri, Sergio
Author_Institution
Dep. of Econ., Manage. & Industrial Eng., Politecnico di Milano, Milan, Italy
Volume
4
fYear
2004
fDate
10-13 Oct. 2004
Firstpage
3827
Abstract
Production planning and control (PP&C) is increasingly becoming a critical activity. In particular, scheduling decisions, which are the final temporal decision-making phase where industrial and supply chain managers could act for maintaining satisfactory production system performances, turn out to be more and more critical. Industrial practitioners are in trouble in understanding the best scheduling policy for their plants, also because they are not able to measure the obtained results and to compare it with other policies. In such a context, the paper illustrates the implementation of a wider performance measurement system for the evaluation of scheduling solutions (PMSESS). PMSESS is currently under development in a large initiative, the special interest group 4 on benchmarking and performance measurement of scheduling solutions, established in the context of the IMS NoE community.
Keywords
decision making; production control; production planning; scheduling; final temporal decision-making phase; performance measurement system; production control; production planning; satisfactory production system performances; scheduling solutions evaluation; supply chain managers; Current measurement; Decision making; Electrical equipment industry; Electronic switching systems; Industrial economics; Industrial engineering; Job shop scheduling; Production systems; Proposals; Quality management;
fLanguage
English
Publisher
ieee
Conference_Titel
Systems, Man and Cybernetics, 2004 IEEE International Conference on
ISSN
1062-922X
Print_ISBN
0-7803-8566-7
Type
conf
DOI
10.1109/ICSMC.2004.1400941
Filename
1400941
Link To Document