• DocumentCode
    434007
  • Title

    Dynamic rescheduling with stability

  • Author

    Masuchun, Ruedee ; Ferrell, William C., Jr.

  • Author_Institution
    Dept. of Instrum. Eng., King Mongkut´´s Inst. of Technol., Bangkok, Thailand
  • Volume
    3
  • fYear
    2004
  • fDate
    20-23 July 2004
  • Firstpage
    1876
  • Abstract
    Previously, most studies of job shop rescheduling problems only include efficiency in the objective function; consequently, the new schedule may be completely different from the previous schedule in order to obtain the optimal efficiency. Moreover, in the real manufacturing environment, costs not only arise when changes are made to the jobs in the original schedule but they are greater as changes are made closer to the current period. In this research, a multi-objective function that simultaneously addresses efficiency and stability is developed. A periodic rescheduling strategy is employed to determine when to construct a new schedule. A genetic local search algorithm is used to obtain a good schedule for the job shop problem in a dynamic environment. The results demonstrate that adding stability in the objective function can increase the stability of the schedule with slight effect on the efficiency.
  • Keywords
    genetic algorithms; job shop scheduling; search problems; stability; genetic local search algorithm; job shop rescheduling problem; multi-objective function; periodic rescheduling strategy; real manufacturing environment; Costs; Delay; Dynamic scheduling; Genetics; Job shop scheduling; Manufacturing; Production; Scheduling algorithm; Stability; Timing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Control Conference, 2004. 5th Asian
  • Conference_Location
    Melbourne, Victoria, Australia
  • Print_ISBN
    0-7803-8873-9
  • Type

    conf

  • Filename
    1426919