• DocumentCode
    436326
  • Title

    Fuzzy real option valuation in a power station reengineering project

  • Author

    Augusto Alcaraz Garcia, F.

  • Volume
    17
  • fYear
    2004
  • fDate
    June 28 2004-July 1 2004
  • Firstpage
    281
  • Lastpage
    288
  • Abstract
    A new tool for valuing real options, Fuzzy Real Option Value (FROV), was defined by Carlsson and Fuller introducing fuzzy numbers into the Black-Scholes formula as a method to better deal with imprecise information and unccrfainty involved in Large-scale investment projects. This paper presents an application of thc FROV model in a real investment project from the energy sector. The Naantali Power Plant, Finland, is considering a portfolio of investment alternatives for the re-engineering of its combined heat and power coal units. Cash flows are assessed by means of a mixed integer-programming problem and after their conversion to fuzzy numbers, the Fuzzy NPV and FROV are calculated and the optimal investment timing proposed using a decision process tree developed by the Wacno Team. Also, a sensitivity analysis on the parameters of the fuzzy B-S formula is carried out and the results analyzed.
  • Keywords
    Computer aided software engineering; Cost accounting; Gases; Natural gas; Portfolios; Power engineering and energy; Power engineering computing; Power generation; Production; Timing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Automation Congress, 2004. Proceedings. World
  • Conference_Location
    Seville
  • Print_ISBN
    1-889335-21-5
  • Type

    conf

  • Filename
    1439379