• DocumentCode
    437401
  • Title

    Assessment of interruption costs for commercial customers in Korea

  • Author

    Choi, S.B. ; Nam, K.Y. ; Kim, D.K. ; Jeong, S.H. ; Ryoo, H.S. ; Lee, J.D.

  • Author_Institution
    Korea Electrotechnology Res. Inst., Changwon, South Korea
  • Volume
    1
  • fYear
    2004
  • fDate
    21-24 Nov. 2004
  • Firstpage
    470
  • Abstract
    This paper presents assessment of the interruption costs for commercial customer in Korea with customer survey methodology. When various research results are examined, assessment of direct interruption cost is much more simple. Especially, in the case of commercial customers, it is known that the assessment of direct interruption cost is more useful. Accordingly, this paper selected the customer survey method to assess the interruption cost for commercial customer in Korea considering interruption and customer characteristic.
  • Keywords
    costing; power system economics; commercial customers; customer survey method; interruption costs; reliability; Business; Costs; Energy conservation; Power system planning; Power system reliability; Telephony;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power System Technology, 2004. PowerCon 2004. 2004 International Conference on
  • Print_ISBN
    0-7803-8610-8
  • Type

    conf

  • DOI
    10.1109/ICPST.2004.1460040
  • Filename
    1460040