• DocumentCode
    441584
  • Title

    Co-Optimization of Level Schedules for Mixed-Model Assembly Line in just-in-time Production System

  • Author

    Song, Hua-Ming

  • Author_Institution
    School of Economy Management, Nanjing University of Science & Technology, Nanjing 210094, China E-MAIL: huaming@mail.njust.edu.cn
  • Volume
    1
  • fYear
    2005
  • fDate
    18-21 Aug. 2005
  • Firstpage
    96
  • Lastpage
    101
  • Abstract
    Line balancing and model sequencing are tightly interrelated problems in mixed model assembly line. In traditional model, the otherness of operation time of different models and the effect of line balancing on the model sequencing have been ignored. In practice, the operation times of different models are very uneven, and it is very difficult to achieve an effective line balancing for such assembly lines. In allusion to the shortcoming of traditional sequencing model, this paper established sequencing model on leveling the part usage with consideration of line balancing and operation time. A co-evolutionary algorithm based method is proposed to solve balancing problem and sequencing problem simultaneously; a numerical instance and computational result that compares the hierarchical approach are presented.
  • Keywords
    Line balancing; co-evolutionary; level; model sequencing; Assembly systems; Cybernetics; Electronic mail; Machine learning; Machine learning algorithms; Production systems; Scheduling; Space exploration; Technology management; Line balancing; co-evolutionary; level; model sequencing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Machine Learning and Cybernetics, 2005. Proceedings of 2005 International Conference on
  • Conference_Location
    Guangzhou, China
  • Print_ISBN
    0-7803-9091-1
  • Type

    conf

  • DOI
    10.1109/ICMLC.2005.1526926
  • Filename
    1526926