DocumentCode
449793
Title
Project Progress Tracking Template - Using a Repeatable GSS Process to Facilitate Project Process Management
Author
Fang Chen ; Briggs, R.O. ; Corbitt, G. ; Nunamaker Jr., J.F. ; Sager, J. ; Gardiner, S.C.
Author_Institution
University of Manitoba
Volume
1
fYear
2006
fDate
4-7 Jan. 2006
Abstract
This article presents the findings of an action research study in which a repeatable GSS (Group Support System) process was adopted by project teams to track their progress. The repeatable GSS process, implemented by means of a GSS template, was employed and evaluated in both face-to-face and distributed group interactions. The study results indicate that use of a GSS template can facilitate project progress tracking by providing structural support for team interaction and serving as an electronic repository or permanent memory of team interaction. The results also suggest that existing GSS software could be improved though various feature enhancements and additions.
Keywords
Business; Collaboration; Collaborative software; Economic indicators; Monitoring; Outsourcing; Programming; Project management; Risk management; Statistics;
fLanguage
English
Publisher
ieee
Conference_Titel
System Sciences, 2006. HICSS '06. Proceedings of the 39th Annual Hawaii International Conference on
Conference_Location
Kauia, HI, USA
ISSN
1530-1605
Print_ISBN
0-7695-2507-5
Type
conf
DOI
10.1109/HICSS.2006.399
Filename
1579327
Link To Document