DocumentCode :
459097
Title :
Automation and remote monitoring hierarhical system for a hydro-energy group
Author :
Emanoil, Doina ; Stanciu, Melania
Author_Institution :
IPA SA - Autom. Egineering, Bucharest
Volume :
1
fYear :
2006
fDate :
25-28 May 2006
Firstpage :
400
Lastpage :
405
Abstract :
The hierarchical system has, as a main element, an assembly of 3 high performance programmable automatons which process data from existing facilities or from their local programmable automatons. This assembly achieves the following operations: it is of high capacity regarding the numeric, digital inputs and outputs on relays; communicates directly with the operator panel and with the group computer, which in turn can communicate through Ethernet network with the central station computer or directly with the zone dispatching; receives information on the operating of the facilities and equipment that serves the turbine and the hydrogenerator; processes these information ensuring the optimum operating of the hydro-energy group at starting, at system coupling, at charging/descharging of charge and at normal or failure stopping; allows a diagnosis of damages and defects emerged in operating; ensures local and remote command and supervision of the hydro-energy group provided with this automation hierarchical system. The automation facility has the following functions: a) upgrading the operator station pursuing: the way commands are carried in the group facilities the manoeuvres made in facilities the starting-stopping sequence the sequence of charging/descharging of active and reactive power; b) ensuring the operating regimes: no-load operating regime of the turbine no-load operating regime of the hydrogenerator charge operating regime of the hydrogenerator with initial incentive power charging by coupling to the energy system; c) ensuring of signals for initiating the stop of the group with charge descharge or charge throw; d) ensuring of optimum start and stop conditions with charge descharge; e) the tracking of the parameters of the hydrogenerator and turbine facilities in operating; f) and checking in operating the status of the turbine facilities and hydrogenerator before starting at zero revolution speed of the turbine as well as monitoring
Keywords :
automation; computerised monitoring; data communication equipment; local area networks; programmable controllers; turbines; Ethernet network; automation; central station computer; hydro-energy group; hydrogenerator; operating regimes; programmable automatons; remote monitoring hierarchical system; turbine; zone dispatching; Assembly systems; Automata; Automation; Computer networks; Digital relays; Dispatching; Ethernet networks; Hierarchical systems; Hydraulic turbines; Remote monitoring; hierarchical system; hydro-energy group; operating regimes; programmable automaton;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Automation, Quality and Testing, Robotics, 2006 IEEE International Conference on
Conference_Location :
Cluj-Napoca
Print_ISBN :
1-4244-0360-X
Electronic_ISBN :
1-4244-0361-8
Type :
conf
DOI :
10.1109/AQTR.2006.254569
Filename :
4022891
Link To Document :
بازگشت