DocumentCode :
461304
Title :
Kosovo: Construction of New Generation Capacity Proposal of Procedure
Author :
Avdiu, Nysret
Author_Institution :
Fac. of Electr. & Comput. Eng., Prishtina Univ.
Volume :
3
fYear :
2006
fDate :
9-13 July 2006
Firstpage :
1978
Lastpage :
1983
Abstract :
Competitive bidding is being used worldwide for the selection of generation capacity. The European Union (EU) Directives 2003/54 and 2003/55 the Article 7 set that the construction of new additional generation capacity shall be on the basis of the authorization procedure. The Kosovo is not member of EU, and currently is under United Nation (UN) Civil Administration, but the laws adopted in the sector energy are fully compliances to the EU directive for energy. This paper describes an approach for authorization procedure to grant the permit for construction of new power generation capacity in Kosovo and also tendering that includes the usual stages of the bidding process: preliminary planning, call for bids, evaluation and selection of bids and negotiation of the contracts
Keywords :
government policies; power generation economics; EU Directives 2003/54; EU Directives 2003/55; European Union; Kosovo; UN Civil Administration; United Nation Civil Administration; authorization procedure; competitive bidding; contracts negotiation; generation capacity; preliminary planning; Authorization; Business; Electricity supply industry; Electronic mail; Fuel economy; Law; Power generation; Power generation economics; Power supplies; Proposals; authorization procedure; competitive bidding; new generation capacity; tendering procedure;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial Electronics, 2006 IEEE International Symposium on
Conference_Location :
Montreal, Que.
Print_ISBN :
1-4244-0496-7
Electronic_ISBN :
1-4244-0497-5
Type :
conf
DOI :
10.1109/ISIE.2006.295876
Filename :
4078551
Link To Document :
بازگشت