Title :
Study on interval-based economic evaluation methods for power construction projects
Author :
Xiao Jim ; Yan-yan, Cui ; Li-wei, He
Author_Institution :
Tianjin Univ., Tianjin
Abstract :
This paper introduces an interval-based approach in economic evaluation on power construction projects. Firstly, interval models are set up to extend classic methods, including Interval net present value method, Interval payback period method, interval internal rate of return method. Additionally, a method to measure risk is also proposed. Then, cases are given to test and compare these interval methods under both certain and uncertain life period conditions. Case study suggests that the interval-based methods are efficient and flexible to deal with evaluation problems on power construction projects, which can effectively judge the feasibility of a project, as well as estimate the risk likely to be undertaken. Finally, these three typical methods are comprehensively compared in order to give instruction of practical application.
Keywords :
power markets; risk management; interval internal rate of return method; interval net present value method; interval payback period method; interval-based economic evaluation methods; power construction projects; uncertain life period conditions; Power engineering; Power generation economics; dynamic payback period; economic evaluation; internal rate of return; interval; net present value; power construction projects;
Conference_Titel :
Power Engineering Conference, 2007. IPEC 2007. International
Conference_Location :
Singapore
Print_ISBN :
978-981-05-9423-7