Optimum power supply solution for the 2008 Olympic International Broadcast Centre
Author :
Zhang, Min ; Zhang, Ye ; Bo, Z.Q. ; Dong, Xinzhou ; Caunce, B.R.J. ; Klimek, A.
Author_Institution :
Dept. of Electr. Eng., Tsinghua Univ., Beijing
fYear :
2007
fDate :
3-6 Dec. 2007
Firstpage :
827
Lastpage :
831
Abstract :
This paper describes the optimum power supply solution for 2008 olympic international broadcast centre (IBC). IBC is the most important building of 2008 Beijing Olympic Games, it will undertake all broadcasting tasks during the game. Therefore high power supply reliability is required. Even a short period outage is not allowed. The switch operation between power sources should be seamless. Diesel generators are used in this project to ensure the continuity of power supply. How to control these generators properly has become a main concern to the project designers and Beijing Olympic Committee. The whole solution presented here was fully discussed by experts and it is very helpful for the later designers in handling such special cases.
Keywords :
diesel-electric generators; power supply quality; sport; 2008 Beijing Olympic Games; Beijing Olympic Committee; Olympic International Broadcast Centre; broadcasting tasks; optimum power supply solution; power supply reliability; Broadcasting; Low voltage; Medium voltage; Mesh generation; Power generation; Power generation economics; Power supplies; Power system economics; Substations; Switches; diesel generator; interconnect; power supply;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power Engineering Conference, 2007. IPEC 2007. International
Conference_Location :
Singapore
Print_ISBN :
978-981-05-9423-7
Type :
conf
Filename :
4510140
Link To Document :
بازگشت