DocumentCode :
477236
Title :
Design and first tests of five 100 GW Fast LTD cavities driving an e-beam diode load
Author :
Kim, A. ; Sinebryukhov, V. ; Kovalchuk, B. ; Bastrikov, A. ; Durakov, V. ; Volkov, S. ; Frolov, S. ; Alexeenko, V. ; Mazarakis, M. ; McDaniel, D. ; Olson, C. ; Struve, K. ; Gilgenbach, R.
Author_Institution :
Institute of High Current Electronics , Academichesky Ave. 2/3, 634055 Tomsk, Russia
Volume :
1
fYear :
2007
fDate :
17-22 June 2007
Firstpage :
144
Lastpage :
147
Abstract :
A module consisting of five 100 GW Fast LTD cavities stacked in series was tested with e-beam diode load to study how a number of cavities behave and add their energy, power and voltage output in a voltage adder configuration assembly. In this report we present the design of the module and diode, and compare test results with simulations.
Keywords :
Cathodes; Current measurement; Diodes; Electrodes; Electron emission; Electronic equipment testing; Inductance measurement; Insulation; Laboratories; Voltage;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Pulsed Power Conference, 2007 16th IEEE International
Conference_Location :
Albuquerque, NM
Print_ISBN :
978-1-4244-0913-6
Electronic_ISBN :
978-1-4244-0914-3
Type :
conf
DOI :
10.1109/PPPS.2007.4651809
Filename :
4651809
Link To Document :
بازگشت