    Earned Value Project Management of Model-Centric Software Development

  • Author

    Li Jin-hua ; Wei Chang-jiang ; Li Jing ; Li Qiong

  • Author_Institution
    Coll. of Inf. Eng., Qingdao Univ., Qingdao
  • fYear
    2008
  • fDate
    12-14 Oct. 2008
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    The paper describes an approach to managing software projects with earned value (EV) combining with function point. We improve function point count rules for software models to calculate EV parameters and indexes, and use function point as software project baselines and performance measurement in the software project. We propose an evolutionary work breakdown structure (WBS) that is able to flexibly orient to software development processes instead of premature and stiff software design. Both the project plan and WBS are made and refined iteratively as more information available from the project development. The method of controlling model-driven software projects is presented. A controlled experiment shows the usefulness and effectiveness of the method for monitoring schedule and costs in software projects.
  • Keywords
    project management; software engineering; earned value; function point count rules; project management; schedule monitoring; software design; software development; software models; software projects; work breakdown structure; Costs; Electric breakdown; Financial management; Measurement; Model driven engineering; Performance evaluation; Programming; Project management; Software performance; Unified modeling language;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Wireless Communications, Networking and Mobile Computing, 2008. WiCOM '08. 4th International Conference on
  • Conference_Location
    Dalian
  • Print_ISBN
    978-1-4244-2107-7
  • Electronic_ISBN
    978-1-4244-2108-4
  • Type

    conf

  • DOI
    10.1109/WiCom.2008.2959
  • Filename
    4681148