Title :
The process modeling of creating work breakdown structures of automobile R&D project based on PDCA
Author :
Yang, Ying ; Yu, Bengong ; Ma, Xijun
Author_Institution :
Sch. of Manage., Hefei Univ. of Technol., Hefei
Abstract :
Work breakdown structures are the base for project management. The quality of work breakdown structures of automobile R&D project directly affects the control of the process of automobile new product development in time, cost, scope, quality and other aspects. In order to improve the quality of work breakdown structures, the paper introduces Plan-Do-Check-Action cycle and develops a distinct process model by integrating the objective management and process management. The model contains four key indicators, such as scope, awareness, responsibility and risk, to evaluate the quality of work breakdown structures in the process. The paper also presents specific tools and methods to the implementation of the model with example.
Keywords :
automobiles; product development; project management; quality management; research and development; automobile R&D project; plan-do-check-action cycle; product development; project management; quality management; work breakdown structures; Automobiles; Costs; Electric breakdown; Packaging; Process control; Product development; Project management; Quality management; Research and development; Scheduling; PDCA; auomobile R&D project; creating; quality; work breakdown structures;
Conference_Titel :
Service Operations and Logistics, and Informatics, 2008. IEEE/SOLI 2008. IEEE International Conference on
Conference_Location :
Beijing
Print_ISBN :
978-1-4244-2012-4
Electronic_ISBN :
978-1-4244-2013-1
DOI :
10.1109/SOLI.2008.4686414