• DocumentCode
    480118
  • Title

    Pseudo-parallel I/O Schedule of Synchronous RAID

  • Author

    Luo, Xun ; Li, Dacheng

  • Author_Institution
    Col. of Math. & Comput. Sci., Hunan Normal Univ., Changsha
  • Volume
    4
  • fYear
    2008
  • fDate
    12-14 Dec. 2008
  • Firstpage
    194
  • Lastpage
    197
  • Abstract
    Pseudo-parallel I/O schedule was proposed aimed at closed queuing requests model based on the platform of RAID system with the cache. The idea of parallelism was applied on the pivotal aspects of data internal migration of RAID system. The experimental results proved that the schedule can greatly develop the utmost data throughput of RAID systems. Moreover, the schedule partially settled the problem of small write of RAID5.
  • Keywords
    RAID; cache storage; parallel processing; queueing theory; scheduling; cache storage; closed queuing request model; data internal migration; pseudoparallel I/O schedule; synchronous RAID; Backplanes; Computer science; Control systems; Job shop scheduling; Mathematical model; Mathematics; Optical switches; Processor scheduling; Read-write memory; Software engineering; RAID; close model; pseudo-parallel;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Computer Science and Software Engineering, 2008 International Conference on
  • Conference_Location
    Wuhan, Hubei
  • Print_ISBN
    978-0-7695-3336-0
  • Type

    conf

  • DOI
    10.1109/CSSE.2008.250
  • Filename
    4722596