DocumentCode
480457
Title
Links Analysis in Resource Constrained Projects
Author
Cui, Wanan ; Yao, ShengBao ; Cao, Xiuning
Volume
5
fYear
2008
fDate
12-14 Dec. 2008
Firstpage
988
Lastpage
991
Abstract
This paper analyses the problems in establishing resource links between activities of former researchers¿ work. And then, we give the intuitive meanings and strict definition of the concept of minimal feasible set (MFS). As a result, we gain several theorems from MFS. Precedence relations between activities can be identified by these theorems.
Keywords
scheduling; set theory; links analysis; minimal feasible set; precedence relations; resource constrained projects; Availability; Clouds; Computer science; Conference management; Educational institutions; Engineering management; Processor scheduling; Project management; Resource management; Software engineering; minimal feasible sets; precedence relations; project schedule; resource constraints; resource links;
fLanguage
English
Publisher
ieee
Conference_Titel
Computer Science and Software Engineering, 2008 International Conference on
Conference_Location
Wuhan, Hubei
Print_ISBN
978-0-7695-3336-0
Type
conf
DOI
10.1109/CSSE.2008.1478
Filename
4723070
Link To Document