DocumentCode
481788
Title
The Application of DCS to Waste Heat Power Generation of Cement Factory
Author
Wu, Jingjian ; Meng, Qingjin ; Xing, Baoling ; Wang, Shaoyun
Author_Institution
Sch. of Control Sci. & Eng., Univ. of Jinan, Jinan
Volume
1
fYear
2008
fDate
19-20 Dec. 2008
Firstpage
822
Lastpage
826
Abstract
According to the production process and the control requirement of pure low temperature waste heat power generation plant, we design a set of distributed control system in waste heat power generation plant. The whole structure, task assignment and important control loop are analyzed. The system is composed of a supervisory and control layer and a process control layer. The DCS can realize the supervising of technology process, automatic controlling of two boilers and a steam turbine - generator group with assist equipments. We propose expert PID and control strategy of fuzzy PID control for controlling boiler water level. The redundancy AC 800F controllers are used in DCS for ensuring the reliability of DCS. The application proves that DCS improves reliability, stability and real-time quality of the product line, it brings both economic and society benefit.
Keywords
boilers; cement industry; distributed control; fuzzy control; process control; three-term control; waste heat; cement factory; distributed control system; fuzzy PID control; process control layer; production process; waste heat power generation; Automatic control; Boilers; Control systems; Distributed control; Distributed power generation; Power generation; Power generation economics; Process control; Production facilities; Waste heat; DCS; Waste Heat Power Generation; expert PID; fuzzy PID;
fLanguage
English
Publisher
ieee
Conference_Titel
Computational Intelligence and Industrial Application, 2008. PACIIA '08. Pacific-Asia Workshop on
Conference_Location
Wuhan
Print_ISBN
978-0-7695-3490-9
Type
conf
DOI
10.1109/PACIIA.2008.272
Filename
4756675
Link To Document