• DocumentCode
    481992
  • Title

    Signalling and telecomms compatibility issues

  • Author

    Claxton, J.

  • fYear
    2008
  • fDate
    3-7 Nov. 2008
  • Firstpage
    323
  • Lastpage
    329
  • Abstract
    There is a significant amount of information on the susceptibility of track circuits and other equipment in the industry domain and this is growing. We are moving towards a ´gabarit´ approach but this will still leave areas that require testing, for example transient generation, track circuits such as HVI and possibly telecom circuits. EMC requirements should be considered throughout the traction system design. These requirements include both emissions levels and failure rates for equipment. Software design for traction systems is increasing important in demonstrating compliance; a sound development strategy is required. It is possible for new and old systems to coexist it just requires a bit of effort and planning.
  • Keywords
    railways; traction; EMC requirements; signalling; sound development strategy; telecomms compatibility; track circuits; traction system design;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Electric Traction Systems, 2008 IET Professional Development course on
  • Conference_Location
    Manchester
  • ISSN
    0537-9989
  • Print_ISBN
    978-0-86341-948-5
  • Type

    conf

  • Filename
    4760180