DocumentCode :
483715
Title :
A case for System Engineering
Author :
Powell, Andy
Author_Institution :
Invensys, UK
fYear :
2006
fDate :
31-31 May 2006
Firstpage :
85
Lastpage :
103
Abstract :
System Engineering has recognised role in avoiding costly integration and performance issues from occurring late in the project lifecycle. These benefits can often be difficult to quantify and can have a long payback period for a large project. There are however a number of tangible early gains that can be made from taking a systems approach from the outset both to the system and the organisation that delivers the system. This talk covers the experience to date of a project in progress.
fLanguage :
English
Publisher :
iet
Conference_Titel :
Systems Engineering in the Railways, 2006 Institution of Engineering and Technology Seminar on
Conference_Location :
London, UK
ISSN :
0537-9989
Print_ISBN :
978-0-86341-634-7
Type :
conf
Filename :
4775922
Link To Document :
بازگشت