DocumentCode
483716
Title
Safety approval for new trains - is it reducing safety?
Author
Shaw, Jon
Author_Institution
Hitachi Rail Group, UK
fYear
2006
fDate
31-31 May 2006
Firstpage
105
Lastpage
116
Abstract
In this paper, the author describes the difficulties faced by Hitachi in obtaining all necessary statutory and regulatory safety approvals for the new Class 395 CTRL Domestic Services EMU (“Project Javelin”). The current rolling stock safety approvals process is detailed together with the complex, numerous and often conflicting requirements of the approvals stakeholders. Finally, the author describes his own personal opinions on how the system could be streamlined without compromising safety.
fLanguage
English
Publisher
iet
Conference_Titel
Systems Engineering in the Railways, 2006 Institution of Engineering and Technology Seminar on
Conference_Location
London, UK
ISSN
0537-9989
Print_ISBN
978-0-86341-634-7
Type
conf
Filename
4775923
Link To Document